Paraguay
Works on Azara and General Díaz enter their final stretch in downtown Asunción
The Municipality of Asunción reported that the road intervention across 16 blocks is advancing with painting and horizontal signage work. The works are part of the ASU 400 Blocks Road Plan.
The Municipality of Asunción reported that the road renovation on Azara and General Díaz streets is entering its final stage, with painting and horizontal signage work in the downtown area of the capital.
According to the municipality, the intervention covers 16 blocks located between Colón and Tacuary. Over the weekend, progress was made on horizontal signage, taking advantage of lighter vehicle traffic.
According to the Municipality of Asunción, the work included the regularization and renovation of the asphalt pavement, as well as the placement of hydraulic concrete in the sections that required a more resistant and durable solution.
The municipality said these tasks aim to improve traffic management and road safety conditions in an area with heavy traffic.
The intervention is part of the ASU 400 Blocks Road Plan, which, according to the municipality, has already surpassed 138 blocks with asphalt paving, hydraulic concrete, resurfacing and the construction of cobblestone streets in different parts of Asunción.
Sources
About this note. Written by El Notero with assistance from artificial intelligence, based on what was published by the cited outlet. El Notero did not do its own reporting on this event.





